Skip to content

FIGHT BACK AGAINST THE SPRAWL OF

AI DATA CENTRES

Get involved

water

IMPACTS ON WATER

Many data centres are being proposed in already water-stressed regions, and it seems every operator insists their project is different. The claims need to be closely examined: 

Many data centres tout the use of closed-loop systems that recirculate the same fluid, and can cut water consumption by up to 70%. But these systems demand higher energy usage, and they aren’t consequence-free: leaks or spills of the corrosion inhibitors, biocides, and glycol used to keep that fluid stable can carry heavy metals at concentrations thousands of times over safe limits for surface water. Additionally, the water sitting in the warm metal pipes builds bacterial biofilm inside the system that needs to be periodically drained and treated with toxic biocides. Where will those toxic wastewaters go when flushed? 

Evaporative systems, the more common and cheaper choice, works differently — and uses more water outright. Up to 85% of the water they draw evaporates, and never returns to the water supply. What doesn’t evaporate becomes “blowdown”: water deliberately bled off because the minerals and treatment chemicals left behind become concentrated, sometimes at 3 to 5 times the level of the original water, before it’s discharged to sewers or waterways.

Most large data centre projects run on gas, and so the water impact extends far upstream to the fracking that supplies the gas itself. A single fracking well uses an average of roughly 3 to 14 million gallons of water to create the slurry injected underground; much of that returns to the surface as toxic wastewater containing heavy metals and, in some cases, radioactive material. These poisons must be permanently disposed of rather than returned to the water cycle.

Our Policy Demand

The Council of Canadians is calling for mandatory disclosure at federal and provincial levels on water source, volume withdrawn, cooling system type, and wastewater treatment method for every data centre, updated monthly and made fully public. Disclosure needs to be regular and public, not only once at approval, and never checked again.

Sources:

Climate Catastrophe

Our Policy Demand

We’re calling for a federal and provincial moratorium on any new, extended, or expanded fossil-fuel generation (gas or coal) built specifically to power a data centre, and mandatory disclosure of every facility’s energy source and emissions, updated monthly and made public.

Colonial extraction

Our Policy Demand

We’re calling for legally binding free, prior, and informed consent under Canada’s UNDRIP Act – before any data centre or associated energy project proceeds on Treaty or traditional territory. This process must occur before data centre permits are approved at all levels of government.

What are they building in there?

Our Policy Demand

We call for mandatory disclosure, mandated at the federal and provincial levels, updated monthly and made public – about all companies using the data centres, and the specific applications being hosted on each site.